IBIZA – FORMENTERA

he Ibiza-Formentera HVAC link has been installed in Q1-Q2 2023. Sisgen executed the cable lay assistance and Pull-in at shore approaches supplying winches and managing local boats. The second part of the project consisted in performing the nearshore cable burial campaign by means of jetting machine and backfilling accomplishing the environment prescriptions. The jetting operation was carried out by means of diver operated Jetting machine, equipped with anti-turbidity device, in order to preserve the seagrasses Ibiza-Formentera

Year: 2023

Client: Prysmian Power Link

Main Client: Red Electrica